S.No. | Ring Road Connectors | Interchange | Districts | Length | Time | Actual Distance | Actual Time | Saved Time | Saved Time % | Saved Fuel |
1 | East RRC 1 Shastri Park to Delhi Campus | | | 4.84 | 5 | 6.1 | 18 | 13 | 72.22% | 33.33% |
2 | East RRC 2 Civil Lines to Gandhi Nagar | | | 3.08 | 3 | 8.7 | 25 | 22 | 88.00% | 40% |
3 | | | | 2.87 | 3 | 3.1 | 10 | 7 | 70.00% | 44.44% |
4 | | | | 7.17 | 7 | 7.2 | 11 | 4 | 36.36% | 40% |
5 | North RRC 3 Mukund Pur to Model Town | | | 3.25 | 4 | 6.3 | 14 | 10 | 71.43% | 33.33% |
6 | | | | 3.08 | 3 | 5.1 | 14 | 11 | 78.57% | 33.33% |
7 | North RRC 5 RU Block To NSP Metro Station | | | 2.38 | 3 | 4.8 | 14 | 11 | 78.57% | 33.33% |
8 | North RRC 6 NSP TO Mangolpuri Flyover | | | 5.69 | 6 | 6.6 | 22 | 16 | 72.73% | 30% |
9 | | | | 4.14 | 4 | 6.2 | 20 | 16 | 80.00% | 37.50% |
10 | | | | 3.97 | 4 | 4.9 | 17 | 13 | 76.47% | 40% |
11 | | | | 3.7 | 4 | 7.6 | 21 | 17 | 80.95% | 40% |
12 | Delhi Ring Road | | | 73 | 73 | 7.6 | 22 | -51 | -231.82% | 27.27% |
13 | Ring Road South | | | 14.5 | 14 | 18 | 32 | 18 | 56.25% | 30% |
14 | Ring Road East | | | 18.4 | 18 | 18.6 | 41 | 23 | 56.10% | 33.33% |
15 | UER 2 | | | 46.6 | 46 | 47.9 | 99 | 53 | 53.54% | 40% |