Munabao (Rajasthan) to Kishenganj

Proposed Expressway by Indian Volunteers Trust: Munabao to Kishanganj

The Indian Volunteers Trust has proposed an expressway connecting Munabao in Rajasthan to Kishanganj in West Bengal, covering a distance of 1,790 km. This expressway aims to significantly reduce travel time and distance, enhancing connectivity and fostering economic development. The current route covers 2,120 km and takes approximately 36 hours to travel. With the new expressway, the travel time will be reduced to just 17 hours and 54 minutes.

Details:

RouteRegionLatitudeLongitude
MunabaoRajasthan25.749370.27835
BarmerRajasthan25.7613771.35614
DhoondhaliRajasthan26.095372.4591
KapardaRajasthan26.2691973.47523
JaipurRajasthan26.7757275.82929
DholpurRajasthan26.7327277.82871
AuraiyaUttar Pradesh26.4786679.51309
VirahimpurUttar Pradesh26.8288482.19798
GorakhpurUttar Pradesh26.7612483.36804
MotihariBihar26.6582184.90083
LaukahiBihar26.4251986.52995
KishanganjWest Bengal26.0923387.94274
Total Distance
Current Route2,120 km
Proposed Expressway1,790 km
Travel Time
Current Travel Time36 hours
Proposed Expressway Time17 hr 54 min
Saved Distance
Distance Saved330 km
Saved Time
Time Saved18 hr 6 min
Percentage Savings
Distance Saved (%)15.57%
Time Saved (%)50.17%

Route Map:

  1. Starting from Munabao, Rajasthan
    • Latitude: 25.7493
    • Longitude: 70.27835
  2. Passing through Barmer, Rajasthan
    • Latitude: 25.76137
    • Longitude: 71.35614
  3. Passing through Dhoondhali, Rajasthan
    • Latitude: 26.0953
    • Longitude: 72.4591
  4. Passing through Kaparda, Rajasthan
    • Latitude: 26.26919
    • Longitude: 73.47523
  5. Passing through Jaipur, Rajasthan
    • Latitude: 26.77572
    • Longitude: 75.82929
  6. Passing through Dholpur, Rajasthan
    • Latitude: 26.73272
    • Longitude: 77.82871
  7. Passing through Auraiya, Uttar Pradesh
    • Latitude: 26.47866
    • Longitude: 79.51309
  8. Passing through Virahimpur, Uttar Pradesh
    • Latitude: 26.82884
    • Longitude: 82.19798
  9. Passing through Gorakhpur, Uttar Pradesh
    • Latitude: 26.76124
    • Longitude: 83.36804
  10. Passing through Motihari, Bihar
    • Latitude: 26.65821
    • Longitude: 84.90083
  11. Passing through Laukahi, Bihar
    • Latitude: 26.42519
    • Longitude: 86.52995
  12. Ending at Kishanganj, West Bengal
    • Latitude: 26.09233
    • Longitude: 87.94274

Proposed Interchanges:

  1. Interchange at Munabao, Rajasthan
    • Latitude: 25.7493
    • Longitude: 70.27835
  2. Interchange at Barmer, Rajasthan
    • Latitude: 25.76137
    • Longitude: 71.35614
  3. Interchange at Dhoondhali, Rajasthan
    • Latitude: 26.0953
    • Longitude: 72.4591
  4. Interchange at Kaparda, Rajasthan
    • Latitude: 26.26919
    • Longitude: 73.47523
  5. Interchange at Jaipur, Rajasthan
    • Latitude: 26.77572
    • Longitude: 75.82929
  6. Interchange at Dholpur, Rajasthan
    • Latitude: 26.73272
    • Longitude: 77.82871
  7. Interchange at Auraiya, Uttar Pradesh
    • Latitude: 26.47866
    • Longitude: 79.51309
  8. Interchange at Virahimpur, Uttar Pradesh
    • Latitude: 26.82884
    • Longitude: 82.19798
  9. Interchange at Gorakhpur, Uttar Pradesh
    • Latitude: 26.76124
    • Longitude: 83.36804
  10. Interchange at Motihari, Bihar
    • Latitude: 26.65821
    • Longitude: 84.90083
  11. Interchange at Laukahi, Bihar
    • Latitude: 26.42519
    • Longitude: 86.52995
  12. Interchange at Kishanganj, West Bengal
    • Latitude: 26.09233
    • Longitude: 87.94274

Purpose and Objectives:

  • Enhanced Connectivity: The expressway will provide a direct and efficient route connecting major regions across Rajasthan, Uttar Pradesh, Bihar, and West Bengal.
  • Economic Development: Reducing travel time and distance will stimulate trade, tourism, and economic activities, contributing to regional growth.
  • Quality of Life: Improved travel conditions will enhance the quality of life for residents and travelers by making journeys safer and more comfortable.
  • Strategic Importance: The expressway will serve as a crucial link between various strategic locations, facilitating smoother and faster movement of goods and people.

Benefits:

  • Red Lights Saved: The expressway will minimize stops and delays caused by traffic signals, enhancing travel efficiency.
  • Traffic Reduction: Providing a direct and efficient route will help alleviate congestion on existing roads, reducing overall traffic.
  • Time Savings: Travelers can save approximately 18 hours and 6 minutes, cutting travel time by 50.17%.
  • Distance Savings: The expressway will shorten the travel distance by 330 km, a reduction of 15.57%.
  • Public Satisfaction: Improved travel conditions will significantly increase public satisfaction, making journeys more pleasant and less stressful.
  • Traffic Stress Management: Enhanced infrastructure and reduced travel times will help manage and reduce traffic stress, contributing to smoother and more enjoyable travel experiences.

The proposed Munabao to Kishanganj expressway represents a visionary project aimed at accelerating development and improving connectivity across India. The Indian Volunteers Trust urges the government to consider this proposal, recognizing its potential to drive progress and enhance the quality of life for residents in the region.

View Full India Purposed Road Map

Leave a Comment

Shopping Cart
Home
Account
Cart
Search